SpineShape System IV (mid- or high-flex rods)
Drug timelines are a Plus or Pro feature.
1 regulatory and trial event tracked for SpineShape System IV (mid- or high-flex rods), covering 2024-06-25 to 2024-06-25. Get the full timeline:
Most recent: Clinical Trial Update: Mid- or High-flex Rods Versus Low-flex Rods of SpineShape System IV for Treatment of Degenerative Lumbar Spine Diseases [NA]