MID-C System
Drug timelines are a Plus or Pro feature.
2 regulatory and trial events tracked for MID-C System, covering 2017-03-09 to 2025-10-03. Get the full timeline:
Most recent: Clinical Trial Update: Post-approval Registry Study to Evaluate the Continued Safety and Probable Benefit of the MID-C System for 5 Years Post-Implantation in Adolescent Idiopathic Scoliosis (AIS) [NA]