Catalyst Wire Dossier Catalyst Wire Dossier

Intermittent electrical stimulation device

Drug timelines are a Plus or Pro feature.

1 regulatory and trial event tracked for Intermittent electrical stimulation device, covering 2024-05-30 to 2024-05-30. Get the full timeline:

Most recent: Clinical Trial Update: Validation and Usability Study of Intermittent Electrical Simulation in Management of Pressure Injuries Stages 1 and 2 [NA]

See pricing