Catalyst Wire Dossier Catalyst Wire Dossier

I-STOP Sling

· DILO Medical
Drug timelines are a Plus or Pro feature.

1 regulatory and trial event tracked for I-STOP Sling, covering 2024-10-30 to 2024-10-30. Get the full timeline:

Most recent: Clinical Trial Update: Long-term Evaluation of the I-STOP Sling in Stress Urinary Incontinence Treatment

See pricing