Catalyst Wire Dossier Catalyst Wire Dossier

Healon EndoCoat

Drug timelines are a Plus or Pro feature.

1 regulatory and trial event tracked for Healon EndoCoat, covering 2025-12-16 to 2025-12-16. Get the full timeline:

Most recent: Clinical Trial Update: Study to Evaluate the Safety of the Viscoelastic Substance PRO-149, Compared to Healon® EndoCoat. [NA]

See pricing