Catalyst Wire Dossier Catalyst Wire Dossier

FAST-FIX FLEX System

· Smith & Nephew, Inc.
Drug timelines are a Plus or Pro feature.

1 regulatory and trial event tracked for FAST-FIX FLEX System, covering 2026-03-18 to 2026-03-18. Get the full timeline:

Most recent: Clinical Trial Update: Safety and Performance Study of the FAST-FIX FLEX System for Meniscal Repairs and Meniscal Transplantations

See pricing