Catalyst Wire Dossier Catalyst Wire Dossier

Echelon FLEX Powered Plus Stapler

Drug timelines are a Plus or Pro feature.

1 regulatory and trial event tracked for Echelon FLEX Powered Plus Stapler, covering 2025-02-21 to 2025-02-21. Get the full timeline:

Most recent: Clinical Trial Update: Comparison Between the Non-powered AEON™ Endostapler and Echelon FLEX™ Powered Plus Stapler With Regards to the Closure of Lung Tissue After Lung Resection in the Presence of Severe Lung Emphysema [NA]

See pricing