Bioresorbable iron-based covered stent
Drug timelines are a Plus or Pro feature.
1 regulatory and trial event tracked for Bioresorbable iron-based covered stent, covering 2026-01-05 to 2026-01-05. Get the full timeline:
Most recent: Clinical Trial Update: Evaluating the Feasibility of Bioresorbable Iron-Based Covered Stent: A Clinical Trial [NA]