Catalyst Wire Dossier Catalyst Wire Dossier

AOP200704

· AOP Orphan Pharmaceuticals AG
Drug timelines are a Plus or Pro feature.

1 regulatory and trial event tracked for AOP200704, covering 2012-07-19 to 2012-07-19. Get the full timeline:

Most recent: Clinical Trial Update: A Short Term Pharmacokinetic, Pharmacodynamic and Tolerability Study to Compare AOP200704 vs. Esmolol [Phase 2]

See pricing