ABLE Exoskeleton
Drug timelines are a Plus or Pro feature.
2 regulatory and trial events tracked for ABLE Exoskeleton, covering 2024-07-31 to 2026-01-27. Get the full timeline:
Most recent: Clinical Trial Update: Exploratory Pilot Study on the Prolonged Use of the ABLE Exoskeleton in Multiple Sclerosis [NA]