ABB C22 Postbiotics
Drug timelines are a Plus or Pro feature.
1 regulatory and trial event tracked for ABB C22 Postbiotics, covering 2024-12-17 to 2024-12-17. Get the full timeline:
Most recent: Clinical Trial Update: Efficacy and Tolerability of ABB I5 Prebiotic and ABB C22 Postbiotics for the Management of Constipation and Gastrointestinal Well-being: a Pilot Trial [EARLY_Phase 1]